In November of 2017 we provided the Falls Area Singletrack organization a conceptual plan and trail design for a three-mile system of multi-use (hiking/biking/running) trails in Tuthill Park on the banks of the Big Sioux River. Construction on the main trail was completed in July and work will continue to finish up the system through the fall of 2018.
Partnered with Sioux Falls Parks and Recreation F.A.S.T. has been working diligently for the last five years to bring this project to fruition. Entirely privately funded by generous donations from the community, businesses, and fundraising efforts from a variety of organizations, it is the first professionally designed and built natural surface trail system in the region. F.A.S.T. has big plans for additional projects in the region so stay tuned!
Falls Area Singletrack Organization (F.A.S.T.)
Conceptual plan and trail design for a three-mile system of multi-use (hiking/biking/running) trails in Tuthill Park on the banks of the Big Sioux River
TrailArts also oversaw the overall development, management, and operation of the parks facilities. Our work included organizing, planning, coordinating, evaluating, and directing the daily operations of the park: planning and implementing short and long-term goals, establishing and implementing policies and procedures, acting as community and government liaison, supervising project development and contracting, supervising construction, repair, and maintenance of park facilities and resources, and coordinating the Parks marketing and information systems.
Today the park is nearly 20 miles strong and has gained a reputation as one of the best managed trail-based parks in the region. It has been an honor and privilege to have served the Hanson-Larsen legacy, the Foundation Board, and the Rapid City community. We’re extremely proud of our work and hope that the contributions we made in establishing sound principals of trail development and resource management for the Park will be sustained and even enhanced in the future.A comprehensive trail system in Colorado Springs, Colorado.
2018 Completed Projects |
Tuthill Park Multi-Use Trails Design/Build Phase 1: Sioux Falls, South Dakota. F.A.S.T./Falls Area Single Track Organization |
First Thunder Trails Construction Phase 2: Black Hills National Forest Rapid City, SD Nehl Residence |
The Genesis Trail: The Great Passion Play, Eureka Springs, AR Tony Boone Trails, LLC |
Black Forest Regional Park Trail Rehabilitation: Black Forest, Colorado. Singletrack Trails, LLC |
Facilities Development & Management: Hanson-Larsen Memorial Park. Rapid City, SD Hanson-Larsen Memorial Park Foundation |
2017 Completed Projects |
Park Development & Management: Hanson-Larsen Memorial Park. Rapid City, SD Hanson-Larsen Memorial Park Foundation |
First Thunder Trails Phase 1: Black Hills National Forest Rapid City, South Dakota. Nehl Residence |
Tuthill Park Multi-Use Trails Planning & Design: Sioux Falls, SD F.A.S.T./Falls Area Single Track Organization |
Floyd Hill Open Space Connector Trail: Clear Creek County Open Space, Evergreen, CO Tony Boone Trails, LLC |
Yamaguchi Park Trails: Developing Urban Single Track (DUST2). Pagosa Springs, CO Tony Boone Trails, LLC |
B4D4 Trail: Arapahoe National Forest, Winter Park, CO Tony Boone Trails, LLC |
Chainsaw Trail Re-Route: Arapahoe National Forest, Winter Park CO Tony Boone Trails, LLC |
Mid-Turkey Trail Improvements: Hanson-Larsen Memorial Park. Rapid City, SD Hanson-Larsen Memorial Park Foundation |
Upper Rim/B-Link Trail Improvements: Hanson-Larsen Memorial Park. Rapid City, SD Hanson-Larsen Memorial Park Foundation |
Dark Forest Trail Improvements: Hanson-Larsen Memorial Park. Rapid City, SD Hanson-Larsen Memorial Park Foundation |
2016 Completed Projects |
Skyline Trail Construction Phase 3, Skyline Wilderness Park Natural Surface Trail System. |
West Dinosaur Trail Construction, Skyline Wilderness Park Natural Surface Trail System. |
Trail Planning and Design Phase 2, Skyline Wilderness Park Natural Surface Trail System. |
Trails and Facilities Management, Hanson-Larsen Memorial Park. |
Outlaw Ranch Trail Planning and Design/Construction Consulting, Outlaw Ranch |
West Launch Trail Planning and Design/Construction Consulting. |
2015 Completed Projects |
Trail Design and Construction. Skyline Wilderness Park Natural Surface Trail System. |
Trails and Facilities Management, Hanson-Larsen Memorial Park. |
Road To Trail Construction. "T-Trail" Improvements. Chuck Lien Family Park. |
2014 Completed Projects |
Skyline Wilderness Park Natural Surface Trail System, Rapid City, South Dakota. |
Custer State Park Sunday Gulch Trail Improvements. Custer, South Dakota. |
Hanson Larsen Memorial Park Foundation. (Ongoing) |
Black Hills Power Line Reclamation/Remediation. Rapid City, South Dakota |
2013 Completed Projects |
Trails and Facilities Management, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Forest Health Management, Hanson-Larsen Memorial Park, Rapid Cty, South Dakota |
Skyline Trail Construction Phase 1, Skyline Wilderness Park, Rapid City South Dakota |
Founders Valley Trail System Phase 2, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Road Remediation Phase 3, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Far East Trail Improvements,Hanson-Larsen Memorial Park, Rapid City, South Dakota |
North Sunset Trail Improvements,Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Sunset and Tower Road -to-Trail Conversions, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
M-West Trail Improvements, Hanson-Larsen Memorial Park Foundation, Rapdi City, South Dakota |
Lien Family Park Trail Improvements, Chuck Lien Family Park, Rapid City, South Dakota |
Winter Storm Atlas Cleanup/Fuels Reduction Phase 1, Hanson-Larsen Memorial Park Foundation |
2012 Completed Projects |
Trails and Facilites Management, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Forest Health Management, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Skyline Trail Phase 1 Design, Skyline Wilderness Park, Rapid City, South Dakota |
Founders Valley Trail Phase 1, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Road Remediation Phase 2, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Upper Rim Trail Improvements, Hanson-Larsen Memorial Park, Rapid City South Dakota |
Power Line Reclamation and Remediation, Black Hills Power, Rapid City, South Dakota |
2011 Completed Projects |
The Horseshoe Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Tranquil Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Northern Exposure Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Trails and Facilites Management, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
North Forty Road Remediation Phase 2, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Upper Ridgeline Trail Improvements, Stratton Open Space, Colorado Springs, Colorado |
2010 Completed Projects |
Stratton Springs Trail, Stratton Open Space, Colorado Springs, Colorado |
North Loop Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
St. Johns Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
North Forty Road Remediation, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Trails Development Manager, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Buzzards Roost Trails, Black Hills National Forest, Mystic District, South Dakota |
Project Management and Oversight, Hanson-Larsen Memorial Park Project, Rapid City, South Dakota |
Ridge Trail Spur, Stratton Open Space, Colorado Springs, Colorado |
2009 Completed Projects |
Stratton Open Space, Colorado Springs, Colorado |
Far West Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Wild Turkey Trail, Hanson Larsen Memorial Park, Rapid City, South Dakota |
Far East Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
M-East Trail, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
Construction Management and Oversight, Hanson-Larsen Memorial Park, Rapid City, South Dakota |
High Chaparral Open Space Trail Improvements, Colorado Springs, Colorado |
2008 Completed Projects |
|
|
High Chaparral Open Space Ridgeline Trail Scenic Overlook |
|
Hansen-Larsen Park Community Park, Rapid City, South Dakota. |
|
Ft. Lincoln State Park Nature Trail Extension, North Dakota. |
|
Fort Stevenson State Park, North Dakota. |
|
Betasso Preserve Feasibility Study. Boulder County, Colorado. |
|
Fraser to Granby Trail, Granby Ranch, Colorado. |
No Photo |
Gross Reservoir Trailhead Reclamation, Colorado. |
No Photo |
Indian Creek Homeowners Association Trail Feasibility Survey. |
|
Indian Hills Resort Nux Ba Gaa Trail. North Dakota. |
|
Harlan County Lake OHV Park Design |
|
Ridgeline Open Space Trail Project Phase 2. Castle Rock, Colorado. |
|
High Chaparral Open Space Trail Improvement Phase 2 |
2007 Completed Projects
|
|
|
High Chaparral Open Space Trail Improvements Phase 1. |
|
Shadowcliff Mountain Resort Driveway and Parking Improvements. |
|
University Park Open Space Trail Improvements |
|
Bear Creek Park XC Race Course Phase 1. |
|
Ridgeline Open Space Trail Project. Castle Rock, Colorado. |
|
Gun Club 9 Trail Project Sun Valley, Idaho. |
|
Marabou Ranch Trails Project. Steamboat Springs, Colorado. |
|
Indian Hills Resort Nux Baa Ga Trail. North Dakota |
|
Castlewood Canyon State Park Project, Colorado. |
2006 Completed Projects |
|
|
Red Rocks Canon Open Space: 31st St. Trail Connection: City of Colorado Springs Trails & Open Space (TOPS) Department. Colorado.
Prime Contractor Layout and construction of 1800 linear feet of 48”to 60” rolling contour trail in Colorado Springs newest and most diverse open space acquisition. This plan/build project, much of which traversed reclaimed landfills and access roads, presented us with many man-made planning and construction challenges that led to some of our most creative solutions to date. |
|
Venetucci Farm Nature Trail: Venetucci Farm Foundation. Fountain, Colorado.
Prime Contractor. Performed consulting services for the initial layout and construction for an interpretively based nature walk trail circumnavigating the properties. Finalized layout, coordinated volunteers, and contributed mechanized construction services for the completion of 2500 linear feet of a one to two mile proposed system. |
|
North Cheyenne Canon Park, Columbine Trail Rehabilitation Phase 3: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Prime Contractor. Completed on the Upper Columbine Trail, this project involved the rehabilitation of approximately 4500 of the most technically challenging sections of the trail system. Utilizing mini-excavators and our expert trail crew, TrailArts reconstructed six climbing turns, two large retaining walls; three armored and retained stream crossings, and over 50 grade dips and drains in six weeks! |
|
North Cheyenne Canon Park, Columbine Trail Rehabilitation Phase 4: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Prime Contractor. Completed 2500 feet of machine-assisted rehabilitation on the Lower Columbine Trail. This project, located directly under the Pinnacle Peak Climbing Area, included a 325 foot trail re-route with stone-retained climbing turns, and required numerous stone crib wall retainers and extensive excavation to restore the trail to a 48” wide specification. This phase also completed our involvement with the Columbine Rehabilitation Project with over 14,000 linear feet of trail reconditioned over the last two seasons. |
|
Stone-Retained Natural Surface Driveway: Durland Residence. Colorado Springs, Colorado.
Prime Contractor. A plan/build project involved extensive excavation into steep side-slope, construction of 200sff of hand-laid gravity-supported natural stone retaining walls, installation of 40 feet of underground culvert drain, 4” of compacted road base, and 8” of compacted crusher fine surfacing. |
|
Falcon Trail Rehabilitation: United States Air Force Academy, Colorado.
Subcontractor for Arrowhead Trails, Inc. Sub-Contracted planning services, hand-built and mechanized new trail construction, hand built and machine-assisted trail rehabilitation; trail closure, corridor clearing/thinning, and gravity-supported stonework for Arrowhead Trails, Inc. TrailArts assisted with the rerouting and rehabilitation of over 12.5 miles of trail over a 1-year period. |
|
Buena Vista River Walk Trail: Buena Vista, Colorado.
Subcontractor for Arrowhead Trails, Inc. Sub-Contracted for Arrowhead Trails, Inc. on the construction of an 1800 foot, 48” wide crusher fine surfaced trail on the banks of the Arkansas River. Built in conjunction with Buena Vistas new riverside kayaking and rafting facilities, this trail formalizes river access for water sports, fishing, and hiking. |
|
Spruce Mountain Open Space, Douglas County Open Space. Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted with final trail layout and performed trail corridor clearing for this Arrowhead Trails, Inc. project. This two mile rolling-contour trail route to the summit of Spruce Mountain reroutes existing fall-line social trails and removes the visitor base from critical habitat zones. |
|
Kurt Gowdy State Park, Wyoming.
Subcontractor for Arrowhead Trails, Inc. Assisted with the construction of 2.5 miles of hand-built 18-24” single track trail for Arrowhead Trails Inc. An ongoing project for 2007, this IMBA designed system will include bridges and numerous rock-garden, monster boulder and stone built sections! |
2005 Completed Projects
|
|
|
Spitzmiller/Kane Trailhead: Town of Grand Lake, Colorado.
Primary Contractor. Performed plan/build construction management for the development of the Spitzmiller Trailhead at the gateway of Rocky Mountain National Park. This project reclaimed a short section of road on the boundary of Grand Lake and Rocky Mountain National Park to create trailhead access to the Continental Divide Trail system. |
|
Stone-Retained Natural Surface Walkways: Campbell Residence.
Colorado Springs, Colorado. Primary Contractor. Phase 2, and the culmination of a plan/build project continued from 2004, we constructed another 200sff gravity-supported stone retaining walls, 100 linear feet of stone-retained surfaced access walkways, and complete re-vegetation and landscaping of disturbed areas with native plant species. In all, over 800sff of hand-laid gravity-supported native stone walls and over 200 linear feet of filled and compacted walkways were constructed on this project. |
|
North Cheyenne Canon Park Columbine Trail Rehabilitation Phase 1: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Primary Contractor. Completed the first of four phases of rehabilitation construction on the historic Columbine Trail System in North Cheyenne Canon Park. This nonmechanized reconstruction addressed 1600 linear feet of the Mid-Columbine section including the re-construction of six switchback turns and major portions of trail bench by hand. |
|
North Cheyenne Canon Park Columbine Trail Rehabilitation Phase 2: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon:
Primary Contractor. Completed on the upper Mid-Columbine section, this machine-assisted reconstruction encompassed 4600lf of trail, 12 switchback turns, and numerous washout areas. Utilizing 48” wide rolling contour construction methods, TrailArts completed the project in just five weeks. |
|
North Cheyenne Canon, Columbine Trail Rehabilitation Phase 2-B: Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Primary Contractor. A Plan/Build project to re-route a previously unsustainable section with 625 linear feet of 48” wide rolling contour alignment. This new section not only replaced 500ft of rutted fall-line trail but also allowed the closure of an additional 665 linear feet of unsustainable and redundant social paths in the immediate area. |
|
Oklahoma State Parks: Beavers Bend State Park, Broken Bow, Oklahoma.
Subcontractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails, Inc. with the machine-assisted construction of a five-mile 48” wide rolling contour hiking/biking trail system on the shores of Broken Bow Reservoir. This IMBA designed stacked-loop system was completed in just three weeks! |
|
Flagstaff Mountain ADA Loop: City of Boulder, Colorado.
Subcotractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails, Inc. with project management and construction of 800lf of 48” wide ADA spec. surfaced and compacted trail on the summit of Flagstaff Mountain above Boulder. |
|
Royal Arch Trail: City of Boulder, Colorado. Subcontractor for Arrowhead Trails, Inc.
Supervised rehabilitation construction of 1500lf of the Royal Arch Trail under Boulder’s famous Flatirons. This Arrowhead Trails, Inc. (ATI) project included the installation of over 160 hand-laid stone steps and over 500sff of crib walls. |
|
Davidson Mesa Open Space: City of Louisville, Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails, Inc. (ATI) with volunteer coordination during the construction of approximately one mile of hand-built and machine-assisted trails. |
|
Bobcat Ridge Open Space: City of Ft. Collins, Colorado.
Subcontractor for Arrowhead Trails, Inc. Performed construction supervision for Arrowhead Trails Inc. during the development of five miles of 48” wide hiking/biking trails. This project included extensive stonework, bridge construction, and one mile of ADA compliant crusher fine surfaced trail. |
|
Falcon Trail Rehabilitation Phase 1: United States Air Force Academy, Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails Inc. with the construction of the first 3500 linear feet of new-trail re-routes scheduled for this 12.5 mile project. Also completed over 1000 linear feet of closure and obliteration of social and re-routed trail routes. |
2004 Completed Projects
|
|
|
Stone Retained Natural Surface Walkways: Campbell Residence.
Colorado Springs, Colorado. Plan/Build project to re-construct retaining walls and establish more user-friendly access around the homeowner’s structure. Demolition included the removal of 300sff of wood-tie retainers and steps. The construction phase included four native stone, hand-laid, gravity-supported retaining walls totaling over 500sff, curving stone-retained access pathways around both the front and rear of the dwelling, and significant slope contouring and revegetation. |
|
Willow Creek & Nelson Ranch Open Spaces,Douglas County Open Space, Colorado.
Subcontractor for Arrowhead Trails, Inc. Conducted Project Supervision for the planning and construction phases. Completed in 20 weeks, this beautiful nine mile long, 48" wide trail system is located near the Colorado Trail and Pike National Forest. |
|
Arkansas Headwaters Recreation Area (AHRA): Colorado State Parks, Colorado.
Subcontractor for Arrowhead Trails, Inc. Supervised the construction of 225sff of trailside retaining walls and a 14-step stone staircase on the Helcla Junction Campground Riverside Trail. This project utilized native stone and was dry-laid, chinked, and armored to withstand seasonal high-water events. |
|
Vega State Park: Grand Mesa, Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted with the construction of 2165 linear feet of hand built 18" wide hiking trail through aspen stands and lakeside meadow to allow hiking access to the southeast shore of the reservoir. |
|
Various Trails: City of Aspen, Colorado.
Subcontractor for Arrowhead Trails, Inc. Supervised the construction of a 3500lf 48" wide hiking and biking trail and assisted with the construction of numerous trail projects for Arrowhead Trails, Inc. |
|
Royal Arch Trail Rehabilitation: City of Boulder Open Space: Boulder, Colorado.
Subcontractor for Arrowhead Trails, Inc. Supervised the rehabilitation construction on the notable Royal Arch Trail under Boulder's famous Flatirons. The Arrowhead Team constructed and rehabilitated 1750lf of single track hiking trail, including over 100 stone steps and 300sff of trail-retaining crib walls. |
1998-2003 Trail Projects
|
|
|
Natural Stone Retaining Walls: Wilson Residence. Colorado Springs, Colorado.
Primary Contractor. Constructed two native-stone dry-laid retaining walls totaling 375sff. This project involved significant excavation, cut-slope contouring and revegetation in addition to the construction of new walls bordering the driveway area and rear patio. |
|
Stratton Open Space Trails Inventory: City of Colorado Springs Trails and Open Space (TOPS) Department.
Primary Contractor. Provided consulting services facilitate initial GPS trail surveys and site analysis for the Stratton Open Space Park Master Plan Project. |
|
Evans Canyon Trail Connections: Reno, Nevada.
Subcontractor for the International Mountain Bicycle Association (IMBA) Assisted IMBA with the training and orientation of Trail Specialists on machine-built trail-finishing techniques. Provided training and supervision for volunteers from the Truckee Meadows Trail Association, Reno Wheelmen, and Washau County Parks Department for two weekend trail projects and ongoing volunteer involvement. |
|
Cheyenne Mountain State Park, Colorado.
Subcontractor for Arrowhead Trails, Inc. TrailArts assisted Arrowhead Trails Inc. with construction and supervised the ground crew that ultimately constructed and finished 14 miles of 48" natural surface trail in just 20 weeks. We also assisted volunteers from IMBA with the final planning phase and initial trail construction of the Medicine Wheel Trail. |
|
Swallowtail Trail: Nelson Ranch Open Space, Douglas County Open Space, Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails, Inc. (ATI) with the final planning phase and initial construction of a 2.7 mile trail. Also worked in conjunction with the Mile High Youth Corps who completed the handwork finishing. |
|
Chamberlain Trail Connection: Colorado Springs Trails and Open Space (TOPS) Department. Colorado Springs, Colorado.
Subcontractor for Arrowhead Trails, Inc. Assisted with construction and finishing of numerous sections of the Chamberlain Trail including a 90' x 3' hand-laid retaining wall. Work also included reclamation of the lower Chutes Trail, and obliteration and closure of social trails. |
|
Pole Creek Preserve, Fraser, Co.
Subcontractor for Arrowhead Trails, Inc. Assisted Arrowhead Trails Inc. (ATI) with the final construction and warranty phase of this six-mile hand-built 18-24" private multi-use trail system. |
|
North Cheyenne Canon Park, City of Colorado Springs Parks & Recreation Department.
Colorado Springs, Colorado. Provided over 10,000 of hours of Volunteer Trail Construction and Crew Leadership for projects throughout the Canon from 1989 through 2002. |