Latest Trail News

  • Stratton Open Space Phase 1 completed.

    Approximately 2 miles high-use designated trails have been rehabilitated this winter; including re-construction of existing sustainable alignments,  construction of several new trail routes, and remediation of several unsustainable social/legacy pathways.  Essentially…

    Read more...

  • OUT THERE: The path more taken

    ANDREW WINEKE
    2009-11-25 17:39:37

    A great trail can be about the destination — the doughnuts atop Barr Trail, the views from Eagle Peak, the falls at St. Mary’s — or it…

    Read more...

  • TrailArts to perform trail rehabilitation at Stratton Open Space Park in Colorado Springs, Colorado.
    Rehabilitation and remediation will begin in November on several unsustainable sections of trail in the park.
    Read more...


  • The year on the Hill! TrailArts finishes up work at the Hansen-Larsen Memorial Park in Rapid City.
    Trail construction is nearing completion with over 12 miles of multi-use, single track, and down-hill, and legacy trails on the ground!…

    Read more...

  • Telegraph Road to Trail
    Take a beat up old access road and turn it into a contoured flow-line?  Sure!  No problem! This one’s fun for sure!  Thanks to the Rapid City Parks Departments Director Jerry Cole, and the…

    Read more...

  • Far West Trail Lower Leg. 

    Deep drainages, big timber, and numerous sections of bedrock characterized the terrain on this route.  Dave tapped on all of his experience to create what could be the most beautiful and flowing…

    Read more...

  • Upper Turkey and Upper Far West Trails
    Ah yes!  More Rocks! And thanks to IMBA Trail Solutions Specialist Dan Hudson, we really started making some footage!  The connection to the “western slope” and the Sunset Trail is complete…

    Read more...

  • Lower and Mid and Lower Turkey Trails

    Another trail takes shape through the rocks.  Lots of turns on this one! And plenty of access points to great legacy single track.  We’ll eventually link-up with the Sunset trail on…

    Read more...

  • Groundbreaking for Far East Trail in Hansen-Larsen Memorial Park!

    The IMBA Trail Specialists Joey Klein and Jason Wells have arrived and we’re ready to attack the primary gateway trail for the project!  Just in time for the Black…

    Read more...

  • TrailArts Braves Spring Blizzards!

    Construction has slowed a bit since late March as Mother Nature has decided to bless the Black Hills region with three separate spring blizzards!  Now that the weather looks like it’s on the…

    Read more...

  • Trail Construction Resumes on M-Hill Rapid City! Construction is underway on the M East Gateway Trail! This 2,700 ft alignment will climb from…

    Read more...
  • Stonework resumes at High Chaparral Open Space Scenic Overlook!
    The new ADA compliant scenic overlook under construction at the high point of the High Chaparral Ridgeline Trail offers amazing views of the foothills…

    Read more...
  • Dirt (and rocks) Fly at Cowboy Hill Rapid City!
    Dave, Joey Klein of IMBA Trail Solutions, and Gre Mazu of Singletrack Trails, Inc have completed machine assisted construction on the “Sunset”, “M” East 3, and “M-Connection” Trails!…

    Read more...
2006 Completed Projects

Red Rocks Canon Open Space: 31st St. Trail Connection: City of Colorado Springs Trails & Open Space (TOPS) Department. Colorado.
Prime Contractor
(click here to see more)
Layout and construction of 1800 linear feet of 48”to 60” rolling contour trail in Colorado Springs newest and most diverse open space acquisition. This plan/build project, much of which traversed reclaimed landfills and access roads, presented us with many man-made planning and construction challenges that led to some of our most creative solutions to date.
 
Venetucci Farm Nature Trail: Venetucci Farm Foundation. Fountain, Colorado.
Prime Contractor.
(click here to see more)
Performed consulting services for the initial layout and construction for an interpretively based nature walk trail circumnavigating the properties. Finalized layout, coordinated volunteers, and contributed mechanized construction services for the completion of 2500 linear feet of a one to two mile proposed system.
 
North Cheyenne Canon Park, Columbine Trail Rehabilitation Phase 3: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Prime Contractor.
(click here to see more)
Completed on the Upper Columbine Trail, this project involved the rehabilitation of approximately 4500 of the most technically challenging sections of the trail system. Utilizing mini-excavators and our expert trail crew, TrailArts reconstructed six climbing turns, two large retaining walls; three armored and retained stream crossings, and over 50 grade dips and drains in six weeks!
 
North Cheyenne Canon Park, Columbine Trail Rehabilitation Phase 4: City of Colorado Springs Parks & Recreation Department/Friends of Cheyenne Canon.
Prime Contractor.
(click here to see more)
Completed 2500 feet of machine-assisted rehabilitation on the Lower Columbine Trail. This project, located directly under the Pinnacle Peak Climbing Area, included a 325 foot trail re-route with stone-retained climbing turns, and required numerous stone crib wall retainers and extensive excavation to restore the trail to a 48” wide specification. This phase also completed our involvement with the Columbine Rehabilitation Project with over 14,000 linear feet of trail reconditioned over the last two seasons.
 
Stone-Retained Natural Surface Driveway: Durland Residence. Colorado Springs, Colorado.
Prime Contractor.
(click here to see more)
A plan/build project involved extensive excavation into steep side-slope, construction of 200sff of hand-laid gravity-supported natural stone retaining walls, installation of 40 feet of underground culvert drain, 4” of compacted road base, and 8” of compacted crusher fine surfacing.
 
Falcon Trail Rehabilitation: United States Air Force Academy, Colorado.
Subcontractor for Arrowhead Trails, Inc.
(click here to see more)
Sub-Contracted planning services, hand-built and mechanized new trail construction, hand built and machine-assisted trail rehabilitation; trail closure, corridor clearing/thinning, and gravity-supported stonework for Arrowhead Trails, Inc. TrailArts assisted with the rerouting and rehabilitation of over 12.5 miles of trail over a 1-year period.
 
Buena Vista River Walk Trail: Buena Vista, Colorado.
Subcontractor for Arrowhead Trails, Inc.
(click here to see more)
Sub-Contracted for Arrowhead Trails, Inc. on the construction of an 1800 foot, 48” wide crusher fine surfaced trail on the banks of the Arkansas River. Built in conjunction with Buena Vistas new riverside kayaking and rafting facilities, this trail formalizes river access for water sports, fishing, and hiking.
 
Spruce Mountain Open Space, Douglas County Open Space. Colorado.
Subcontractor for Arrowhead Trails, Inc.
(click here to see more)
Assisted with final trail layout and performed trail corridor clearing for this Arrowhead Trails, Inc. project. This two mile rolling-contour trail route to the summit of Spruce Mountain reroutes existing fall-line social trails and removes the visitor base from critical habitat zones.
 
Kurt Gowdy State Park, Wyoming.
Subcontractor for Arrowhead Trails, Inc.
(click here to see more)
Assisted with the construction of 2.5 miles of hand-built 18-24” single track trail for Arrowhead Trails Inc. An ongoing project for 2007, this IMBA designed system will include bridges and numerous rock-garden, monster boulder and stone built sections!